Team:Power: Difference between revisions

From Electromagnetic Field
Jump to navigation Jump to search
No edit summary
No edit summary
 
(7 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Infobox Team
{{Infobox Team
| Picture =
|name=Power
name = Power
|desc=All things to do with powering the site. Also responsible for basic site & emergency lighting.
| desc = Power
|lead=User:Benny
| lead =  
|MailingList=https://lists.emfcamp.org/listinfo/power
| email =
|  needvolunteers =
|  Location=
}}
}}
All things to do with powering the site. Also responsible for basic site & emergency lighting.
All things to do with powering the site. Also responsible for basic site & emergency lighting.


Line 14: Line 10:


{{TeamUserList}}
{{TeamUserList}}
== We Need People to Help With ==
* Helping plan the power infrastructure
* Laying out power during build-up (no experience needed)
* Helping tear down power after the event (no experience needed, but it’s exhausting)

Latest revision as of 19:07, 22 July 2018

Power
All things to do with powering the site. Also responsible for basic site & emergency lighting.
Lead(s) Benny
Mailing List https://lists.emfcamp.org/listinfo/power


All things to do with powering the site. Also responsible for basic site & emergency lighting.

Team members

{{#ask: Team::Team:Team:Power | mainlabel = User | ?Attendee_Name=Name | ?Email | ?Arrival | ?Departure }} (refresh table)

We Need People to Help With

  • Helping plan the power infrastructure
  • Laying out power during build-up (no experience needed)
  • Helping tear down power after the event (no experience needed, but it’s exhausting)