Site Search: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 5: | Line 5: | ||
* Good transport links | * Good transport links | ||
* Good access to setup vehicles (no low bridges) | * Good access to setup vehicles (no low bridges) | ||
* | * Some kind of water supply/sewage connection | ||
* Well drained | * Well drained | ||
* Space for parking | * Space for parking | ||
Line 12: | Line 12: | ||
* Existing electricity supply (it's probably more hassle than providing it ourselves) | * Existing electricity supply (it's probably more hassle than providing it ourselves) | ||
=Candidate Sites= | =Candidate Sites= |
Revision as of 00:45, 5 April 2013
The biggest issue for EMF is to find a good site. Here are our requirements, in order of priority:
- Space for at least 1500 people (3-8 hectares/8-15 acres/0.03-0.06 sq km)
- Ability to get a good internet connection (1 gigabit+)
- Good transport links
- Good access to setup vehicles (no low bridges)
- Some kind of water supply/sewage connection
- Well drained
- Space for parking
We don't care about:
- Existing electricity supply (it's probably more hassle than providing it ourselves)
Candidate Sites
Site Name | Details |
---|---|
Colerne Airfield, Wiltshire (nr Bath) | Owned by a company of a friend of London Hackspace |