Site Search: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
The biggest issue for EMF is to find a good site. Here are our requirements, in order of priority: | The biggest issue for EMF is to find a good site. Here are our requirements, in order of priority: | ||
* Space for at least 1500 people (3- | * Space for at least 1500 people (3-8 hectares/8-15 acres/0.03-0.06 sq km minimum) | ||
* Ability to get a good internet connection (1 gigabit+) | * Ability to get a good internet connection (1 gigabit+) | ||
* Good transport links | * Good transport links |
Revision as of 00:39, 5 April 2013
The biggest issue for EMF is to find a good site. Here are our requirements, in order of priority:
- Space for at least 1500 people (3-8 hectares/8-15 acres/0.03-0.06 sq km minimum)
- Ability to get a good internet connection (1 gigabit+)
- Good transport links
- Good access to setup vehicles (no low bridges)
- Water supply
- Well drained
- Space for parking
We don't care about:
- Existing electricity supply (it's probably more hassle than providing it ourselves)
Candidate Sites
Site Name | Details |
---|---|
Colerne Airfield, Wiltshire | Owned by a company of a friend of London Hackspace |