Site Search: Difference between revisions

From Electromagnetic Field
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
The biggest issue for EMF is to find a good site. Here are our requirements, in order of priority:
The biggest issue for EMF is to find a good site. Here are our requirements, in order of priority:


* Space for at least 1500 people (3-8 hectares/8-15 acres/0.03-0.06 sq km minimum)
* Space for at least 1500 people (3-8 hectares/8-15 acres/0.03-0.06 sq km)
* Ability to get a good internet connection (1 gigabit+)
* Ability to get a good internet connection (1 gigabit+)
* Good transport links
* Good transport links
Line 12: Line 12:


* Existing electricity supply (it's probably more hassle than providing it ourselves)
* Existing electricity supply (it's probably more hassle than providing it ourselves)
*


=Candidate Sites=
=Candidate Sites=
Line 19: Line 20:
! Details
! Details
|-
|-
| Colerne Airfield, Wiltshire
| Colerne Airfield, Wiltshire (nr Bath)
| Owned by a company of a friend of London Hackspace
| Owned by a company of a friend of London Hackspace
|}
|}

Revision as of 00:40, 5 April 2013

The biggest issue for EMF is to find a good site. Here are our requirements, in order of priority:

  • Space for at least 1500 people (3-8 hectares/8-15 acres/0.03-0.06 sq km)
  • Ability to get a good internet connection (1 gigabit+)
  • Good transport links
  • Good access to setup vehicles (no low bridges)
  • Water supply
  • Well drained
  • Space for parking

We don't care about:

  • Existing electricity supply (it's probably more hassle than providing it ourselves)

Candidate Sites

Site Name Details
Colerne Airfield, Wiltshire (nr Bath) Owned by a company of a friend of London Hackspace